|
|
|
Select Destination
|
Site Search
|
|
|
|
|
|
Grower Diaries
|
|
Entry Date
|
Nick Name
|
Location
|
Saturday, March 13, 2021
|
|
Matt D.
|
Connecticut
|
|
Entry 15 of 90 |
|
|
|
|
Heating Cable Installed
With the area recently tilled the heating cable is next to add. Some portions are covered up but the pattern is so the thermostat can be between two heating elements to allow for an accurate reading.
Typically, it takes about three days to get the soil to 72F (22.2C) which is the target root zone temperature.
|
|
|
|
|
Top of Page
Questions or comments? Send mail to Ken AT bigpumpkins.com.
Copyright © 1999-2024 BigPumpkins.com. All rights reserved.
|