|  |   | 
        
          | 
              
                |  |  
			    | Select Destination | Site Search |  |  
                
                |  |  |  | 
  
    |  | Grower Diaries | 
  
    |  |     
			
				|     
						
							| Entry Date | Nick Name | Location |  
							| Tuesday, April 27, 2021 |   | VTJohn | Jericho Vermont |  
     
						
							|   | Entry 10 of 193 |   |  |  |  |  
				|     
						
							| The tractor makes this so much easier as we used to move it to the patch by wheelbarrow. This is roughly 5 hours of work and around 9 yards on on this patch. Subsoiler was used in a checkerboard pattern and tilled 3 times. The soil heating cables are dug in and plugged in with the hoops in place. I will give the cables 5 days to heat the soil before planting Sunday or Monday. |  |  | 
  
    |  | 
   
 
 
 | 
| Top of Page 
 Questions or comments? Send mail to Ken AT bigpumpkins.com.
 Copyright © 1999-2025 BigPumpkins.com. All rights reserved.
 
 |